Stop Work Orders

The construction industry plays an important role in our fight against dengue. NEA urges the construction industry to play its part to curb dengue transmission and protect their workers and residents around their work sites against dengue. Construction sites are of particular concern as they can easily become the foci of dengue transmission.

NEA takes stringent action against errant contractors at construction sites found to be poorly maintained, favourable for mosquito breeding and / or breeding mosquitoes.

Enforcement actions including Stop Work Orders (SWO) and prosecutions in Court would be taken against such sites. During the Stop Work Order, only corrective actions are permitted. The contractor is also required to review the effectiveness of sanitation and vector control programmes within the site. The order will only be lifted when the measures have been completed to the satisfaction of NEA.

List of Sites Issued with Stop Work Orders (SWO)

The listing provided is for awareness purposes only. It is for restricted use in the context of this document and should not be further reproduced without permission, in writing. NEA endeavours to ensure that the information herein is accurate at the time of publishing.

The information provided in this listing is accurate as at 21 Oct 2021

Name of Company Project Location SWO Status SWO Effective Date SWO Lifted Date
Jia Yi Construction Pte Ltd Lots 9720K PT, 9723L PT, 9725M PT & 99528L PT MK 24 at Bartley Road Active 15/10/2021
Tiong Aik Construction Pte Ltd Lot 09671C, 09673W MK 22 at Hougang Ave 2 (Hougang Planning Area) Lifted 24/9/2021 4/10/2021
Tiong Aik Construction Pte Ltd Lot 09671C, 09673W MK 22 at Hougang Ave 2 (Hougang Planning Area) Lifted 28/8/2021 31/8/2021
Lian Beng Construction (1988) Pte Ltd Lot 06521X MK 17 at Potong Pasir Avenue 1 Lifted 27/8/2021 8/9/2021
HPC Builders Pte Ltd Lot 04799A MK07 at 20 Tuas South Avenue 14 Lifted 18/8/2021 25/8/2021
Nippon Builders Pte Ltd Block 401 to 428 Choa Chu Kang Avenue 3/4 Lifted 17/8/2021 31/8/2021
Progressive Builders Pte Ltd Lots 1289W PT, 6017W PT, 7546T PT, 7550A PT, 7553X, 7556M, 7561V PT & 98310P PT MK 25 At Jalan Satu/Jalan Dua Lifted 7/8/2021 12/8/2021
Unison Construction Pte Ltd Lot 04103V MK 25 At 128 Meyer Road (Marine Parade Planning Area) Lifted 19/7/2021 23/7/2021
Expand Construction Pte Ltd Lot 00299X TS10 At 1 Esplanade (Downtown Core) Lifted 15/7/2021 16/7/2021
Star Engineering Pte Ltd Lots 02409P, 02411V, 02413T, 02415K, 02417X, 07647V, 07649T, 97544V & 97545P MK25 At Guillemard Lane (Geylang Planning Area) Lifted 13/7/2021 19/7/2021
Ramo Industries Pte Ltd Lot 06354K, MK 25 at Stadium Dr Lifted 8/7/2021 12/7/2021
Keong Hong Construction Pte Ltd Lots 00870W-PT, 01075K-PT at Mandalay Road (Novena Planning Area) Lifted 30/6/2021 8/7/2021
Samsung C&T Corporation Design and construction of North South corridor (tunnel) between Toa Payoh Rise and Marymount Lane Lifted 15/6/2021 23/6/2021
Lian Beng Construction (1988) Pte Ltd Lot 06521X MK17 at Potong Pasir Avenue 1 Lifted 11/6/2021 21/6/2021
Wee Hur Construction Pte Ltd Lot 10881L MK17 at Potong Pasir Avenue 1 Lifted 11/6/2021 21/6/2021
Greatearth Corporation Pte Ltd Lot 09209M MK05 at West Coast Crescent Lifted 4/6/2021 11/6/2021
China Construction (South Pacific) Development Co Pte Ltd Lot 05780W MK24 at How Sun Road Lifted 29/5/2021 3/6/2021
Ramo Industries Pte Ltd Lot 06354K MK25 at Stadium Drive Lifted 20/5/2021 27/5/2021
China Construction (South Pacific) Development Co Pte Ltd Lot 04132L MK23 at Sims Avenue Lifted 10/5/2021 12/5/2021
Dragages Singapore Pte Ltd Lot 10815X MK17 At Woodleigh Lane Lifted 7/5/2021 19/5/2021
China Construction (South Pacific) Development Co Pte Ltd Lots 03894T & 03919A MK01 at Stirling Road (Queenstown Planning Area) Lifted 5/5/2021 12/5/2021
Double-Trans Pte Ltd Lots 00137A, 01551C, 03204A, 03206N, 03595A, 03608X, 03705V, 03711A, 03712K, 03714X, 03732L, 03733C, 03734M, 03736V, 03737P & 04061T MK10 Lifted 30/4/2021 5/5/2021
Keong Hong Construction Pte Ltd TS 29 on Lots 00870W-PT, 01075K-PT at 1 Mandalay Road (Novena Planning Area) Lifted 27/4/2021 4/5/2021
Frontbuild Engineering & Construction Pte Ltd Lot 06779T MK27 at 20 Bedok North Street 2 (Bedok Planning Area) Lifted 19/4/2021 22/4/2021
Ssangyong-Hyundai Joint Venture Lots 05473X, 08797M, 09499L, 09654P, 10157K, 10266L, 10268M, 10332P, 10334A & 10336N MK26 at Marine Terrace Lifted 16/4/2021 17/4/2021
Sato Kogyo (S) Pte Ltd Lots 016416C, 02159T, 02459V, 02460M, 02486L, 02487C, 02521P, 03869L, 04491L, 04571T, 04573K, 05413X, 05417W, 05811A, 05932K, 05935L, 06280P, 06655L, 06657M, 07774A, 07776N, 08101V, 08247M, 08750X, 09278L, 09279C, 09243N, 09427M, 09431W, 09432V, 09556N, 09557X, 09914X, 10202A, 10203K, 12103K, 12104N, 14123A, 14124K, 14132M, 14133W, 98516V & 99869X, MK15, MK17 & MK18 At Upper Thomson Road Lifted 15/4/2021 22/4/2021
Progressive Builders Pte Ltd Lots 1289W PT, 6017W PT, 7546T PT, 7550A PT, 7553X, 7556M, 7561V PT & 98310P PT MK25 at Jalan Satu/ Jalan Dua (Geylang Planning Area) Lifted 13/4/2021 20/4/2021
Penta-Ocean Construction Company Ltd Design and construction of Sin Ming Station and construction of tunnels for Thomson Line Lifted 6/4/2021 16/4/2021