Development Control Circulars

Revised Procedure For The Submission Of Building Plans On Environmental Health

CIRCULARS - 16 May 98

CBPU/10.13

DID: 7319675

16 May 98

President
Singapore Institute of Architects
72B Tras Street
Singapore 079011
(Fax: 62262663)

President
The Institution of Engineers, Singapore
70 Bukit Tinggi Road
Singapore 289758
(Fax: 64671108)

President
Association of Consulting Engineers Singapore
51 Anson Road #02-65
Anson Centre
Singapore 079904
(Fax: 63242581)

Dear Sirs

REVISED PROCEDURE FOR THE SUBMISSION OF BUILDING PLANS ON ENVIRONMENTAL HEALTH

             Currently, qualified persons (QP) are required to submit building plans (BP) on Environmental Health (EH) to the Central Building Plan Unit (CBPU) for checking. After the BPs have been cleared, CBPU will issue BP clearance to enable QPs to apply for BP Approval from the Building Control Division (BCD).

2          With immediate effect, we have revised the procedure for the submission of BPs on EH as follows:

(a) QP consults CBPU on the preparation of BPs and/or seeking of waivers, if required.

(b) QP endorses on the BPs to certify compliance with the Code of Practice on Environment Health (COPEH).(The endorsement is at the Annex).

(c) QP submits the BPs to CBPU, and CBPU will issue BP registration to QPs within 24 hours (without checking).

3          Henceforth, CBPU will cease to issue clearance for the BPs on EH and only register the BPs without checking within 24 hours. QPs may proceed to apply for BP Approval from BCD after the registration of their BPs with CBPU.

4          Please note that for industrial premises, QPs are still required to submit their BPs on Pollution Control to CBPU for clearance. The procedure for the submission and processing of technical plans on sewerage and surface water drainage also remains unchanged.

5          QPs may, however, use the COPEH (1990 edition) for the preparation of their BPs on EH for a period of 3 months up to 15 Aug 98. QPs would need to inform CBPU in writing that their BPs are prepared in accordance with the COPEH (1990 edition). QPs are, however, encouraged to use the revised COPEH immediately.

6          We would be grateful if you could inform your members of the revised COPEH and the revised procedure for the submission of BPs on EH.

7          Please contact the following officers if you need any clarification: Foong Chee Leong DID: 7319675 E-mail: FOONG_Chee_Leong@env.gov.sg

Anselm Gonsalves DID: 731963
E-mail: GONSALVES_Anselm@env.gov.sg

Yours faithfully

FOONG CHEE LEONG
CHIEF ENGINEER
CENTRAL BUILDING PLAN UNIT

cc      President
          Real Estate Developers? Association of Singapore
          Singapore 239924
          (Fax: 6337 2217)

          Director
          Building Control Division
          PWD